ON SITE / ON THE DRAWING BOARD

How high could we go?

Follow dated construction milestones ↗

Two buildings under construction. Two architectural visions. Explore the engineering ambitions behind each, with planned heights kept separate from completed records.

4 projects

Under constructionJeddah · Saudi Arabia

Jeddah Tower

1,000+ m
Planned architectural height

A kilometre-plus concrete tower designed to exceed today’s completed-building height record.

Engineering & construction notes +

A continuous concrete load path

The design uses three tapering wings and interconnected concrete walls. Thornton Tomasetti describes a system without conventional columns, outriggers or floor beams: the walls carry both gravity and wind loads. Extensive wind-tunnel testing informed the taper.

Technical source ↗

Foundation and construction challenge

The published foundation design uses a 5-metre raft on 270 bored piles, each 1.8 metres in diameter and extending as deep as 105 metres. The construction strategy emphasises regional concrete methods and controlling lateral movement and long-term vertical shortening.

Technical source ↗
Status checked 9 September 2026

The Skyscraper Center lists the tower as under construction. Thornton Tomasetti publishes 2026 construction progress. The expected completion year is a database forecast, not an opening commitment.

View status / concept source ↗
Under constructionDubai · United Arab Emirates

Burj Azizi

725 m
Planned architectural height

A mixed-use megatall project on Sheikh Zayed Road, with a substantial structural-steel construction package.

PROJECT TEAM
Architect and structural design
AE7 ↗
Main contractor
Gardinia ↗
Structural-steel contractor
Eversendai ↗
Engineering & construction notes +

Delivery team and steel package

The Skyscraper Center credits AE7 for architectural and structural design and Gardinia as main contractor. Azizi awarded Eversendai an AED 1.1 billion structural-steel contract in April 2026, identifying a major specialist package within the wider construction programme.

Technical source ↗

What is specified so far

The current project record gives a planned height of 725 metres and 133 above-ground floors. Doka is listed for formwork and International Foundation Group for foundation equipment. An independently checked pile schedule and lateral-system specification are not available in this preview.

Technical source ↗
Status checked 9 September 2026

Listed as under construction, with construction starting in 2025. Dubai Media Office reported the structural-steel contract award in April 2026. Height, floor count and completion forecasts remain subject to change.

View status / concept source ↗
Concept · unbuiltTokyo · Japan

Sky Mile Tower

1,600+ m
Concept height, as described by KPF

The vertical-city centrepiece of KPF’s NEXT Tokyo research study for Tokyo Bay.

PROJECT TEAM
Architectural research and design
Kohn Pedersen Fox ↗
Engineering & construction notes +

Vertical neighbourhoods

KPF describes residential communities linked by multi-level sky lobbies for a proposed 55,000 residents. The study joins tower planning with a wider archipelago of high-density districts and coastal infrastructure.

Technical source ↗

A system larger than the tower

The concept includes breakwaters, floodgates and hexagonal infrastructure rings to address storm surges. Renewable-energy and food-production strategies are integrated into the study. These are proposed systems, not measured performance of a built development.

Technical source ↗
Read the full concept case study ↗
Status checked 9 September 2026

A research vision, not an active construction project. The year 2045 belongs to the study’s scenario and must not be read as a promised completion date.

View status / concept source ↗
Concept · unbuiltChicago · United States

The Illinois

1,609 m
Envisioned height · one mile, rounded to metres

Frank Lloyd Wright’s historical mile-high proposal, an early vision of a city in one tower.

PROJECT TEAM
Architect and concept author
Frank Lloyd Wright ↗
Engineering & construction notes +

The proposed structure

Wright imagined a deeply rooted central structure with four buttressing wings and cantilevered floors. A concrete-and-steel core and steel frame were intended to support the tower. The proposal’s wind-resistance theory was never validated through construction.

Technical source ↗

The vertical-transport problem

The 528-storey scheme proposed 76 elevators with five-storey cabs. Its extreme transportation ambitions illustrate the gap between an architectural vision and a deliverable engineering design. No contractor, tested operating system or completion date existed.

Technical source ↗
Read the full concept case study ↗
Status checked 9 September 2026

An unbuilt historical concept. The Frank Lloyd Wright Foundation records that Wright had no site, client or budget for it. There is no active construction programme or appointed builder.

View status / concept source ↗

A selected project watchlist, not a global ranking. Heights are planned or conceptual and may change. A concept’s research horizon or announcement year is not a completion forecast. Neither construction projects nor unbuilt concepts enter the completed top 100.