423 metres tall, 270 Park Avenue is an office skyscraper in New York City, United States. It ranks number 33 among the world's tallest completed buildings by architectural height. [2]
Directory record added 9 September 2026. The original top-ten engineering dossiers have a deeper independent review; this record does not claim that same verification level. See source ↗
ENGINEERING DOSSIER
How 270 Park Avenue works
Project evidence, construction records and the limits of what is documented. A named consultant’s role is kept separate from the architect, contractor and local engineer of record.
Loads above operating railways
The engineer describes a transfer structure called the Tabletop above the lower supports. The tower must deliver large loads through a site occupied by active tracks, so the foundation locations and the superstructure cannot be designed independently.
Several systems sharing lateral loads
A braced core, five levels of outrigger trusses and diamond-shaped facade macro-braces work together. Post-tensioned anchors engage the bedrock through the caisson caps.
Two kinds of vibration
A mass damper limits wind accelerations. Train-induced excitation required separate modelling calibrated against the former building’s measured response. Controlling wind sway does not automatically solve vibration arriving through the foundations.
The frame description needs to distinguish gravity support from wind and earthquake resistance. Read the engineering guide ↗
Main structural material
Not confirmed
A material label does not establish steel grade, concrete strength, fire protection or connection details. Read the engineering guide ↗
Basement levels
Not confirmed
Basement count does not establish pile depth, founding stratum, bearing pressure or the excavation sequence. Read the engineering guide ↗
Elevator count
Not confirmed
Car count does not establish passenger capacity, speed, zoning, redundancy or peak traffic performance. Read the engineering guide ↗
Construction start
Not confirmed
A start year can refer to enabling works, foundations or the main construction contract. Read the engineering guide ↗
Structural topping out
Not confirmed
Topping out marks a structural milestone; facade work, commissioning and occupancy can follow later. Read the engineering guide ↗
Reading the vertical dimensions
The directory records 423 metres of architectural height and 60 above-ground floors. The highest occupied level has not been confirmed here. Measurement source ↗
Dividing architectural height by floor count would include the crown and any unequal floor heights. It cannot be used as a typical floor-to-floor dimension, a measure of slenderness or a structural design input.
Questions for a deeper technical review
Foundation tests, core and column sizes, construction-stage stability, creep and shortening allowances, wind-tunnel results and facade movement tolerances need project-specific evidence. Their absence here does not imply that the project lacked those studies.
Directory record updated . No dated field checks have been recorded. Updating the page does not re-verify every fact.
View 0 recorded field checks
Field-level source checks
Checked
Field
Evidence and decision
Correction and publication log
: added a visible evidence register and change history. The initial evidence-register release preserved the existing measurements; subsequent corrections appear above.